E-Services Portal
 
 
Case Management System(CMS) :: Docket Information
2535-CE-100 (Active)
Application of Highland Wind Farm, LLC, for a Certificate of Public Convenience and Necessity to Construct a 102.5 Megawatt Wind Electric Generation Facility and Associated Electric Facilities, to be Located in the Towns of Forest and Cylon, St. Croix County, Wisconsin
Highland Wind Farm
 
Applicant(s): Highland Wind Farm LLC (2535)

Project Description: Highland Wind Farm, LLC (Highland) proposes to construct a new wind electric generation facility in the towns of Forest and Cylon in St. Croix County. The facility would consist of 41 wind turbines with a total capacity of 102.5 MW. Each turbine would have the capacity to generate about 2.5 MW.

Case Coordinator: James Lepinski

Adam Ingwell