9808-CE-100 (Active)
Application for a Certificate of Public Convenience and Necessity of Apple River Solar, LLC to Construct a Solar Electric Generation Facility in the Towns of Clayton, Beaver, Apple River, and Lincoln, Polk County, Wisconsin
Apple River Solar 100 MW Generation Facility
 
Applicant(s): Apple River Solar LLC (9808)

Project Description: Apple River Solar, LLC proposes to construct a 100 MW AC solar electric generation facility in the towns of Clayton, Beaver, Apple River, and Lincoln in Polk County, WI. The proposed facility would be on approximately 700 acres of land with the installation of about 300,000 photovoltaic (PV) panels on a single axis tracker system. Other project components would include construction of a substation, collector circuits, an operations and maintenance building, and a 739 foot 161 kV transmission interconnection line. The applicant has proposed some alternative solar array sites for evaluation.

Case Coordinator: Bert Chee